Bathroom Addition

40 SF main floor addition on insulated crawl space that contains newly added 3/4 bathroom. Includes James Hardie pre finished fiber cement siding, aluminum soffit and 30 year architectural shingles. Bathroom includes electrical, insulation, sheetrock, tile, millwork, tile shower, flooing, plumbing fixtures, vanity/top and linen cabinet, light/fan combination, painting, vanity light fixture, surface mount medicine cabinet, accessories and clean-up debris removal.

Average Job Cost Low Range*
$59,257.60
Average Job Cost High Range*
$64,946.45
Design Costs
$1,800.00
* Please note these project prices include premium finishes and all labor and materials. By completing some of the work yourself such as demolition or painting and choosing moderate finishes you can expect to reduce costs by 10-20% or more.