Project 3544-1 Highland Park Second Floor Addition and New Foundation

Completion Date:

Jun 1, 2022

Home Style:

Craftsman Bungalow

Design Style:

Transitional

This was a major whole house project that actually lifted the home and installed a new insulated concrete foundation (ICF) then built a front addition and added a full second floor drastically enlarging the size of the home.  Re-pouring the basement walls allowed for full 8’ ceiling height. The basement remodel included a full bath, family room with gas fireplace and stone facade, walnut wetbar, and a utility room with laundry. Once the house was set down on the new foundation a new front addition with open porch, stone facade, and foyer with open stairway was added to the home.  A new 2nd floor with master suite, full laundry, 2 bedrooms, guest bath and open loft area was also added. Main level remodel included a new gas fireplace in front living room, closing existing side entry and converting the rear bedroom to a pantry and mudroom with rear entry. New windows were installed throughout the main floor. The entire home was painted.

After

Before

Ready to Start Your Project?

Ready to Start?

Schedule a free consultation to discuss your goals, timeline, and budget.

Schedule a free consultation to discuss your goals, timeline, and budget.

Modern Minneapolis home exterior renovation with wood and brick facade at night
Modern Minneapolis home exterior renovation with wood and brick facade at night