May 19, 2014 castlebri

We’ve been hard at work on our Save A Castle homes. Carter is almost done! A rear entry/powder room was added on to the 1st floor of this home. Besides a major gut to most spaces of this home, we remodeled the kitchen, 2nd floor general bathroom, refinished hardwood floors, repainted the entire house, and replaced all windows. The existing sunroom space is now insulated/heated and part of the master bedroom. This home is in a great neighborhood and was in need of a top to bottom restoration. We saved this castle in the nick of time!

For more information on Carter visit our Save A Castle Facebook Page or Save A Castle

Dining Room

Kitchen
The dining room/kitchen area was dramatically transformed into a more open welcoming space. Perfect for entertaining, more cooking, and storage space.

mainentry
The front entry was updated and received a fresh coat of paint and new flooring – making the space feel fresh and inviting.

Bathroom
The bathroom was re-tiled and updated.

Bedroom 2

Bedroom 3

bedroom
The upstairs bedrooms were remodeled and will now be a beautiful space for the new homeowners to enjoy for years to come!