Uncategorized 19 Jun 2025 Project 3544-1 Highland Park Second Floor Addition and New Foundation This was a major whole house project that actually lifted the home and installed a new insulated concrete foundation (ICF)… castlebri
Addition 14 Nov 2024 Project 3929-1 Burnsville Transitional Addition Wanting the front façade of this home to better reflect the grandeur of the home’s backside, the clients came to… Bailey Strobel
Addition, bathroom 05 Apr 2024 Project 3886-1 NE Minneapolis Mid-Century Modern Addition The couple desired to fully utilize their unused attic area in their house, which was built in the 1950's with… Bailey Strobel
Uncategorized 17 Jan 2024 Project 3716-1 NE Minneapolis Eclectic Addition This home was built in the late 1800s, moved to this site in the early 1900s, and was added onto… Bailey Strobel
Addition 10 Jul 2023 Project 3474-5 St. Louis Park Transitional Addition The existing home had a primary suite on the upper level. The ceilings were low, and the bathroom was disjointed,… Bailey Strobel